Start of the excavation work The excavation already reaches the required foundation depth
The excavated site shows the concrete shape of the project
Reinforcement steel structures in preparation of the concrete workReinforcement steel structures in preparation of the concrete workReinforcement steel structures in preparation of the concrete work
Ready mixed concretefilling up the foundationbuilding the foundation
building the walls
building the walls25.11.2019
December 2019December 2019December 2019December 2019Jan 2020: P. Hanna in fornt of the bakery. He reports that the need is unimaginably great. People are really waiting for the bakery to get ready.Jan 2020March 2020