Posted on 27. Jul 201910. Apr 2020 Start of the excavation work The excavation already reaches the required foundation depth The excavated site shows the concrete shape of the project Reinforcement steel structures in preparation of the concrete work Reinforcement steel structures in preparation of the concrete work Reinforcement steel structures in preparation of the concrete work Ready mixed concrete filling up the foundation building the foundation building the walls building the walls 25.11.2019 December 2019 December 2019 December 2019 December 2019 Jan 2020: P. Hanna in fornt of the bakery. He reports that the need is unimaginably great. People are really waiting for the bakery to get ready. Jan 2020 March 2020 By admin Bread for Syria